PACRA Withdraws the Ratings of K-Electric Limited I Retail Utility Sukuk I PKR 3bln I Sep-25
| Issuer | K-Electric Limited |
| Instrument | Short Term Sukuk |
| Amount | PKR 3000 mln |
| Issuance Date | 03-Sep-25 |
| Tenor | 1 Years |
| Redemption Date | 03-Sep-26 |
| Outstanding Amount | - |
| Rating Type | Debt Instrument | |
|
Current (19-Nov-26 ) |
Previous (21-May-26 ) |
|
| Action | Redeem | Maintain |
| Long Term | - | AA |
| Short Term | - | A1+ |
| Outlook | Stable | |
| Rating Watch | - | - |
About
the Entity
KE was incorporated as a limited liability company on September 13, 1913, and its shares are quoted on the Pakistan Stock Exchange Limited (PSX). The registered office of KEL is situated in DHA, Karachi. KEL is the only vertically integrated power utility in Pakistan, managing all key areas – Generation, Transmission, Distribution and Supply – ensuring energy delivery to customers within its licensed areas. KES Power Limited (‘’the Holding Company of KEL’’), incorporated in the Cayman Islands, holds 66.4% and Government of Pakistan holds 24.36% while the remaining are listed as free float shares.
About
the Instrument
K-Electric Limited issued a Rated, Publicly Placed, Unsecured Retail Utility Sukuk of PKR 3,000mln on September 3, 2025, to finance its working capital requirements. The IPO phase was oversubscribed by 2.2 times, reflecting strong investor confidence. The instrument had a tenor of 12 months and carried a profit rate of 3MK + 20 bps p.a. Profit was paid monthly, either via bank transfer or through adjustment in the investor’s K-Electric bill, at the Sukuk holder’s option, and the principal was repaid at par in a bullet payment at maturity. The Sukuk has been fully redeemed on September 3, 2026. As a result, the Pakistan Credit Rating Agency (PACRA) has withdrawn the rating of K-Electric Limited | Retail Utility Sukuk | PKR 3bln | Sep’25.